PARKING LOT STRIPING APRIL 6, 7, & 8 (rain date 4/9) –Vehicles must be removed by 8 AM on the day the work is scheduled in the areas designated. No parking 8AM-4PM.
- Weather permitting, American Striping will be re-painting all the parking spaces, fire lanes, removing Permit Required lettering, and stenciling the assigned parking space numbers on Tuesday, April 6th, Wednesday, April 7th and Thursday, April 8th (with a rain date of Fri., April 9th).
- Once the striping is complete, the new parking rules and regulations will take effect.
Vehicles must be removed by 8 AM on the day of the work is scheduled in the areas designated.
- Vehicles that are not removed will be towed and relocated.
- This work will take the majority of the day to complete.
- Once all the paint and stenciling is complete, the paint will need to dry for ONE HOUR before cars can use the spaces.
Schedule
TUESDAY, APRIL 6, 2021
- 1⁄2 of Twin Rivers Odd – right side/townhouse side of parking lot
- 1⁄2 of Twin Rivers Even – back half and small section to the left of 10596
- All of Faulkner Ridge Circle – the entire parking lot
WEDNESDAY, APRIL 7, 2021
- 1⁄2 of Cross Fox Lane – middle of parking lot to dead end
- 1⁄2 of Twin Rivers Even – front half near 10594, 10596, 10564, 10566
THURSDAY, APRIL 8, 2021
- 1⁄2 of Cross Fox Lane – middle of parking lot to entrance of lot
- 1⁄2 of Twin Rivers Odd – left side/condo side of parking lot